| Sr. No | Document | Download |
|---|---|---|
| 1 | Retrofit Single Pit to Twin Pit | Download |
| 2 | Swachh & Sujal Gaon section 8.3 retrofitting of septic tank with soakpit | Download |
| 3 | Construction of twin pit toilet | Download |
| Sr. No | DO Letter/Circular | Download |
|---|---|---|
| 1 | Advisory on funding provision for Retrofit to Twin Pit Abhiyan/ under Swachh Bharat Mission (Grameen) | Download |
| 2 | Advisory on release of IC material to be used during 'Retrofit to Twin Pit Abhiyan' | Download |
| 3 | Launch of PM 67A and PM 67B module for Retrofitting to Twin Pit Campaign -reg | Download |
| 4 | Advisory for Launch of 'Retrofit to Twin Pit Abhiyan' under Swachh Bharat Mission (G) to be launched on 19t November, 2022 | Download |
| 5 | Advisory for Launch of 'Retrofit to Twin Pit Abhiyan/under Swachh Bharat Mission (G) to be launched on 2 October, 2022 | Download |

